Insulated screed
Insulating screed floor structure 4, 5 & 6 - Choose a different floor structure
+5.7 cm - floor, ground floor, basement, ... - with wooden joists as a subfloor - multilayer parquet, laminate, cork, carpet, and vinyl
Insulating your floor lowers your energy bill, increases your living comfort, and raises the value of your home.
Information
This lightweight floor structure forms an ideal insulated base for your parquet, laminate, cork, carpet, etc. The insulation screed can be covered after a few days of curing with a wooden OSB or Durelis board and screwed onto the Staenis grid, which in this situation serves as a wooden joist structure.
Advantages
- Achieve a perfect end result without experience
- Can be covered with wooden Durelis or OSB boards after 3 days
- Directly suitable for many types of floor finishes
- Lightweight (10 times lighter than a sand-cement screed) and sound-insulating floor
- Possibility to insulate your low floor build-up over the entire thickness.
- Spreading screed work over several days (no stress during placement)
Side view of floor structure
View this floor structure in real life via Sack Zelfbouw
Legend
- Timber framework
- Wooden board
- Pipes (heating, electricity, drainage, etc.)
- Staenis grid (thickness from 4.5 to 9 cm)
- Insulation screed
- OSB board or Durelis tongue and groove board
- Subfloor / felt
- Floating floor covering
- Skirting board
Side view of floor structure with extension legs
Legend
- Timber framework
- Wooden board
- Pipes (heating, electricity, drainage, etc.)
- Staenis extension leg (+ 4 cm extra height)
- Staenis grid (thickness from 4.5 to 9 cm)
- Insulation screed
- OSB board or Durelis tongue and groove board
- Subfloor / felt
- Floating floor covering
- Skirting board
Side view of floor build-up with wooden blocks
Legend
- Timber framework
- Wooden board
- Pipes (heating, electricity, drainage, etc.)
- Wooden blocks 9 x 9 cm
- Staenis grid (thickness from 4.5 to 9 cm)
- Insulation screed
- OSB board or Durelis tongue and groove board
- Subfloor / felt
- Floating floor covering
- Skirting board
Installation video
We deliver insulation screed in bags to your home
The insulation screed is pre-mixed with new EPS beads, combined with cement, water, and specific patented additives.
The EPS beads have a specially small diameter of 2mm-6mm, in order to achieve an even flatter result with the Staenis grid.
The insulation screed in bags is easy to transport and makes it possible for you to insulate your floor yourself.
This non-walkable insulation screed can be used as insulating infill in the Staenis grid, single or double layered with at least 18mm OSB. It can also be used as an insulating levelling layer, with a screed on top.
Enter the screed thickness. Measure from the base on which the screed starts to the top of the screed.
Do not include flooring, adhesive or other layers above.
Enter the combined thickness of the insulating screed and screed. Measure from the base beneath the insulating screed to the top of the screed.
Do not include flooring, adhesive or other layers above.
Enter the thickness of the stabilised sand bed. Measure from the base beneath the sand bed to the top of the sand bed.
Do not include flooring, adhesive or other layers above.
Enter the drainage mortar thickness. Measure from the base beneath the drainage mortar to the top of the drainage mortar.
The screed used to smooth the surface is calculated separately. Do not add extra thickness for it; also exclude adhesive and tiles.
Do not include OSB in this thickness.
Enter the insulating screed thickness. Measure from the base on which the insulating screed starts to the top of the insulating screed.
Do not include OSB or other floor boards on top of the insulating screed. Any screed, adhesive and flooring above are also excluded from this measurement.
Enter the insulating screed thickness. Measure from the base on which the insulating screed starts to the top of the insulating screed.
Do not include the separately calculated levelling compound, adhesive or flooring above.
Do not include OSB in this thickness.
Enter the height of the dry fill in the grid. Measure from the base beneath the grid to the top of the filled grid.
Do not include OSB or other floor boards on top of the system. Underfloor heating, adhesive and flooring above are also excluded from this measurement.
Enter the thickness of the levelling compound layer. Measure from the surface to be levelled to the top of the levelling compound.
Do not include flooring, adhesive or other layers above.
Do not include OSB in this thickness.
Enter the adjusted grid height. Measure from the base on which the feet stand to the top of the grid.
Do not include OSB or other floor boards on top of the grid. Adhesive and flooring above are also excluded from this measurement.
Do not include OSB in this thickness.
Enter the height of the CircoFloor system with fill. Measure from the base on which the adjusting screws stand to the top of the CircoFloor structure.
Do not include OSB or other floor boards on top of the system. Underfloor heating, adhesive and flooring above are also excluded from this measurement.
First select a filling material in the calculator to see its thickness explanation.





